Huawei Sun2000-250ktl-H3 Solar String Inverter Commercial Project on Grid Inverter 250kw

Still deciding? Get samples of $ !
Request Sample

Product Description

i

Basic Information

Model NO. SUN2000-250KTL-H3 Nature of Source Passive inverter
Phase Three Output Power 250kw
Certification CE, ROHS, ISO9001 Type DC/AC Inverters
Power Source Solar Power Cooling Method Smart Air Cooling
Display LED Indicators; WLAN Adaptor + App Origin China

Product Description

Smart PV Controller
250KW Smart PV Controller
Introducing the industry-leading PV Ground-Fault Protection, this controller ensures a rapid shutdown of the on-grid system within 15 milliseconds in a ground fault. This feature effectively prevents fault current, supporting safe inverter operation. Smart Connector Temperature Detection technology involves monitoring sensors around the clock. If abnormal temperatures are detected, the system triggers an alarm and automatically shuts down to prevent failure. The MBUS chip realizes strong interference resistance and smooth communication. A low THDi value of < 1% encourages reliable and consistent output even in weak grids.
PV Controller System
Inverter Detail 1
Inverter Detail 2
Inverter Detail 3
Inverter Detail 4

Technical Specification

Technical Drawing
Efficiency
Max Efficiency ≥99%
Input Data
Max. Input Voltage 1500 V
MPPT Voltage Range 500 V~1500 V
Number of MPP Trackers 6
Output Data
Rated Output Power 250 KW
Rated Output Voltage 800 V, 3W + PE
Max. Output Current 155.9 A

Advantages & Projects

Product Advantage
Project Cases

Manufacturing & Exhibition

Factory 1
Factory 2
Factory 3
Exhibition 1
Exhibition 2

Packaging & Shipping

Packing 1
Packing 2
Logistics 1
Logistics 2
Logistics 3
?

Frequently Asked Questions

Are the battery cells brand new and top quality?
Yes, all batteries are top quality. The QR code is intact, and they are brand new from the original factory.
Do the batteries come with busbars and bolts?
Yes, the price includes busbars and bolts. Each battery cell comes with one set (e.g., if you buy 4pcs, you receive 4 busbars and 8 bolts).
Is every battery tested prior to shipping?
We test all battery voltage and internal resistance strictly before shipping to ensure consistency.
What is the standard delivery time?
It depends on order quantities. Typically, small orders are delivered within 1-15 working days. Mass orders will be confirmed upon inquiry.
Can the Battery Management Systems (BMS) be used in series?
No, battery management systems cannot be used in series. Please ensure compliance with design parameters during use.
What should I do if there is no voltage output after assembly?
After combining the battery pack and protection plate, if there is no output, please double-check that all wiring is correct according to the specifications.

Related Products